以太古高速公路西山隧道的施工实践为例,从设备配置原则,优选斜井施工设备配置的方案,在技术应用、生产效率、制造工期、安装工期、资金投入、使用安全等几方面进行比选,确定安全、合理、经济的配套方案,并进行设备技术选型。通过施工效果,反馈设备配套的科学性和适用性,为长大隧道大坡度斜井的安全快速施工提供借鉴和参考。
Taking the construction practice of Xishan Tunnel on the Swire Expressway as an example, this paper makes a comparison between the technical application, production efficiency, manufacture period, installation period, capital investment and safety of use from the principle of equipment allocation and the scheme of inclined shaft construction equipment configuration , Determine the safe, reasonable and economical package, and equipment selection. Through the construction effect and the scientific and suitability of the feedback equipment, it can be used as a reference for the safe and rapid construction of the large gradient incline in the long tunnel.