论文部分内容阅读
本文主要结合工作实际,分析一下灌注桩在钻孔过程中及水下混凝土灌注过程中可能出现的若干问题,提出必要的防范措施,以保证钻孔灌注桩成桩质量和确保基础工程安全可靠。
Based on the actual work, this paper analyzes some problems that may occur in the process of perfusion piles during the process of drilling and underwater concrete perfusion, and puts forward the necessary precautionary measures to ensure the quality of the bored piles and ensure the safety and reliability of the foundation works.