【摘 要】
:
一、概述龙羊峡水电站位于青海省黄河上游,是我国目前正在施工的大型水电工程。该工程的河床部分采用混凝土重力拱坝,最大坝高178米,共分18个坝段。右岸11号坝段内布置有底
论文部分内容阅读
一、概述龙羊峡水电站位于青海省黄河上游,是我国目前正在施工的大型水电工程。该工程的河床部分采用混凝土重力拱坝,最大坝高178米,共分18个坝段。右岸11号坝段内布置有底孔泄水道,为水电站高程最低的泄水建筑物,最大泄量1,310米~3/秒。控制泄量的工作弧门设置于水道有压段末端,初期蓄水时可向下游供水
I. Overview Longyangxia Hydropower Station is located in the upper reaches of the Yellow River in Qinghai Province, China is currently under construction of large-scale hydropower projects. The project part of the river bed using concrete gravity arch dam, the maximum height of 178 meters, is divided into 18 sections. The No. 11 dam on the right bank is equipped with a bottom hole drain, which is the lowest-lying drainage structure of the hydropower station with a maximum discharge capacity of 1,310m ~ 3 / s. Control of discharge of the work of the arc door is set at the end of the pressure section of the waterway, the initial impounding water supply to the downstream
其他文献
对调控肉菜价格的思考隋进发,于立华一、“菜篮子”主要商品价格存在的问题生猪产销方面存在的问题、主要表现在:1、本地生猪产量不足。目前.哈市生猪(含本省)高时自给量仅达70%,缺口很
再归因训练是目前归因研究的重要领域,作者尝试针对本三院校英语专业学生探索并构建再归因训练模式,并对此开展实验研究以期获得科学的训练模式。
Attribution training is
It is a very difficult problem to directly determine fluid pressure during hydrocarbon migration and accumulation in sedimentary basins. pVt modeling of cou
家具价格离不离谱在中国海关信息咨询中心查阅了“1995年1—6月全国进口商品表”,其中,用号称木材至尊的红木制成的卧房用家具,上半年的进口总额为213564美元,进口总件是553件,平均每件386美元。一套
蚌埠市价格调节基金制度取得显著成效1993年9月,蚌埠市开始在旅店业征收价格调节基金。1994年3月建立了价格调节基金制度。1995年6月以来,根据征收工作的实际情况,又对价格调节基金制度进行了几
为识别含水层参数 ,本文在十进制简单遗传算法 (SGA)的基础上 ,提出了一种改进的组合方法 ,即优体克隆 +子体优生遗传算法 (BCC YGCD GA)。理想模型计算表明 ,与SGA比较 ,BCC
一、概述丰满大坝基础存在较大的断层破碎带,日伪施工时,处理不彻底,影响大坝安全运行。最近地震烈度又提高一度,坝基抗滑稳定安全系数远小于规范要求值,急需加固处理。经比
利用价值工程中的一些基本原则和方法对产品进行经济效益分析,提出的改进方案能改善产品的功能,降低生产成本。
The use of value engineering in some of the basic princi
一、工程概况大黑汀水库枢纽工程是引滦工程的渠首工程,包括溢流坝、重力坝、泄洪底孔、电站及渠首引水涵洞等建筑物。其中溢流坝共设28孔闸门,每孔净宽15米,墩厚3米,一个坝