江苏国信溧阳抽水蓄能发电有限公司由江苏省国信资产管理集团有限公司、中国水电顾问集团中南勘测设计研究院、溧阳市投资公司于2007年3月27日共同出资成立,各家股比分别为85%、10%、5%。公司负责开发建设与运营管理溧阳抽水蓄能电站。该电站是江苏省继沙河、宜兴抽水蓄能电站后的第三座抽水蓄能电站,也是目前江苏省最大的抽水蓄能电站。电站位于江苏省溧阳市天目湖镇,枢纽建筑物由上水库、下水库、输水系统及发电厂房系统等四
Jiangsu Guoxin Liyang Pumped Storage Power Generation Co., Ltd. was jointly funded and established by Jiangsu Guoxin Asset Management Group Co., Ltd., Zhongnan Investigation Design and Research Institute of China Hydropower Consultants Group, and Liyang Investment Company on March 27, 2007 with respective share ratios of 85%, 10%, 5%. The company is responsible for the development, construction and operation of Liyang pumped storage power station. The power plant is the third pumped storage power station in Jiangsu Province following Shahe and Yixing Pumped Storage Power Station and the largest pumped storage power station in Jiangsu Province at present. Power Station is located in Tianmu Lake Town, Liyang City, Jiangsu Province, the hub of the reservoir from the reservoir, the reservoir, water systems and power plant systems and other four