广州市郊区人和拦河坝钢筋混凝土旋倒闸门装置油压缓冲器小结

来源 :广东水电科技 | 被引量 : 0次 | 上传用户:kelly_0810
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
一、工程概况人和拦河坝是流溪河梯级开发最末一级的一项灌溉、通航、发电综合利用工程,整个工程分为坝、桥、船闸、发电站和灌溉渠道等五个部份。拦河主坝为闸坝型式,全长为240米,分两部份:一部份是橡胶坝,长为48.9米;高为4.5米;宽为10.5米。另一部分是驼峰堰上加旋倒闸门。 I. Project Overview Renhe Barrage is an irrigation, navigational and power generation comprehensive utilization project at the last stage of cascade development of Liuxi River. The whole project is divided into five parts: dam, bridge, ship lock, power station and irrigation canal. Barrage main dam for the sluice type, a total length of 240 meters, divided into two parts: one part is a rubber dam, length 48.9 meters; height of 4.5 meters; width of 10.5 meters. The other part is the humpback plus Rotary gate.
其他文献
In order to clarify the role of HA (humic acid)-TiO2 adsorption in the photocatalytic process, a series of experiments were performed to investigate the adsorp
《天堂电影院》是意大利导演托纳多雷执导“时空三部曲”的第一部,虽是一部1988年首映的电影却以其蒙太奇似的叙事结构、纯美流畅又不失细节描绘的画面与配乐及其蕴涵在影片
治疗急性髓性白血病 (AML)必须有强化的骨髓抑制治疗才能取得最大的疗效。本文报道一项随机试验 ,比较 3种积极的儿童和青少年AML缓解后治疗的疗效。方法  1 989年 1 0月至 1 995
1996年5月,我们结合学校学生健康体检进行PPD试验,对强阳性者进行X线检查,检出肺门结核21人,现将检查情况报告如下。 1 资料与方法 1.1 对象:本市涵江区农村镇前小学幼儿班
中共广东省兴宁县径南公社章印大队支部遵照毛主席关于“统筹兼顾,适当安排”的教导,去冬今春对一十七条山坑作出全面规划,把劈山造田与改造山坑低产田有机地结合起来,运用
胰腺癌手术切除后的长期生存率仍不高 ,仅 10 %~ 15 % ,切缘阳性者预后更差。欧洲胰腺癌研究组第 1次试验 (ESPAC- 1)分析辅助放化疗或化疗对胰腺癌切除后切缘阳性者的生存期
在农田水利建设中,常常要碰到曲线测设的事情,例如琉浚河道、砌石护岸、渠道等工程的定线·按照一般的方法,首先要用径纬仪测出转角,然后经过复杂的计算,再用径纬仪放样,限
我国丛生竹资源丰富,但其加工利用的开发远远落后于毛竹。为促进丛生竹的开发利用,以3种常见的大径丛生竹油簕竹、越南巨竹和麻竹为材料,加工成竹篾层积材,并对板材的物理力
The whole catalytic cycle of the carbonylation of methanol to acetic acid catalyzed by Rh complex is theoretically studied. All structural geometries of reactan