通过对索风营水电站Dr2高陡边坡的地质结构及稳定状况进行分析,给出了边坡可能发生的三种破坏模式:倾倒破坏,座滑(剪切)破坏和滑移破坏。并结合边坡的这些破坏模式对边坡进行了处理,取得了良好的施工效果。
Through the analysis of geological structure and stability of Dr2 steep slope in Suofengying Hydropower Station, three possible failure modes of slope are given: dumping failure, slipping (shear) failure and slipping failure. Combined with these failure modes of slope, the slope has been treated and a good construction effect has been achieved.