纪村水电站是陈村水电站的二级站,系径流式电站。电站挡水坝由8个重力式混凝土坝段和左右岸土坝接头组成,混凝土坝建在紫红色粘土质砂岩上。土坝接头建在复盖坡积土上。左坝头与笠帽山山坡相接,右坝头与东干渠的渠堤相接,均为均质土坝。前池正常蓄水位54.81m,最高蓄水位55.81m。坝顶高程57.0m,混凝土坝顶宽4m,左岸土坝顶宽5m,右岸土坝顶宽7m,最大坝高约22m。混凝土坝与左右岸土坝接头之间采用横向档土墙连接。由于左岸土坝排水棱体、排水沟以及8号坝段混凝土档土墙上排水孔设置不当,接着在1983
Jicun Hydropower Station is a secondary station of Chencun Hydropower Station, a runoff-type power station. The power station retaining dam is composed of 8 gravity concrete dam sections and dam abutments on the left and right banks. The concrete dam is built on the purple clayey sandstone. Earth dam joint built in cover slope slope fill. The left dam and the hillside of Mt. Sham are connected, the right dam and the canal of the East Main Canal are connected, all of them are homogeneous earth dams. The front pool normal water level 54.81m, the maximum water level 55.81m. Crest elevation 57.0m, crest width 4m, left bank crest width 5m, right bank crest width 7m, the maximum dam height of about 22m. Between the concrete dam and the left and right shore earth dam joints using horizontal stalls wall connection. Due to the left bank earth dam prongs, drainage ditches, and No. 8 concrete retaining wall drainage holes set properly, then in 1983