论文部分内容阅读
为了及时总结水利水电工程中复杂地质条件下岩石边坡的设计、施工、科研等方面的经验教训,交流信息,明确今后的研究方向,水利电力部科技司和水利水电建设总局委托水利水电爆破咨询服务部及水电三局,于1986年3月25日至29日在陕西省安康水电站工地召开了第一次“水利水电高边坡工程技术交流会”。参加会议的有全国水电系统的科研、设计、施
In order to timely summarize the experiences and lessons of rock slope design, construction and scientific research under complex geological conditions in water conservancy and hydropower projects, exchanging information and clarifying future research directions, the Ministry of Science, Technology and Energy of Water Conservancy and Electric Power and the General Administration of Water Conservancy and Hydropower commissioned the consultation on blasting of water conservancy and hydropower Service Department and Hydropower Bureau, held the first “High-slope Engineering Meeting for Water Conservancy and Hydropower Engineering” at the site of Ankang Hydropower Station in Shaanxi Province from March 25 to March 29, 1986. Participate in the meeting of the national hydropower system research, design, facilities