Preparation of Chromium-iron Metal Powder from Chromium Slag by Reduction Roasting and Magnetic Sepa

来源 :Journal of Iron and Steel Research(International) | 被引量 : 0次 | 上传用户:bear139
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
Chromium slag(CS)has become one of the most hazardous solid waste containing chromium and iron.Based on its characteristics,the technology of reduction roasting and magnetic separation was employed to treat CS.The major impurity element of CS is magnesium and it exists in magnesium ferrite phase,which is hard to recover iron in the absence of additives.During reduction roasting,additives(Al2O3and CaF2)could destroy the structure of magnesium ferrite and improve the iron grade and recovery.The final product,i.e.chromium-iron powder,contains 72.54% Fe and 13.56% Cr,with the iron recovery of 80.34% and chromium recovery of 80.70%. Chromium slag (CS) has become one of the most hazardous solid waste containing chromium and iron. Based on its characteristics, the technology of reducing roasting and magnetic separation was employed to treat CS. Major impurity element of CS is magnesium and it exists in magnesium ferrite phase, which is hard to recover iron in the absence of additives.During reduction roasting, additives (Al2O3and CaF2) could destroy the structure of magnesium ferrite and improve the iron grade and recovery.The final product, iechromium-iron powder, contains 72.54% Fe and 13.56% Cr, with the iron recovery of 80.34% and chromium recovery of 80.70%.
其他文献
库存管理是热水器企业日常运营中的重要环节,也是企业获取持久竞争优势的法宝。良好的库存管理,能帮助热水器企业避免大量突发性订货、交货期延长、需求预测不准确等问题,而且还能提升消费者或合作商对于企业产品的满意度,提升企业信誉。本文以R公司为例,来谈谈热水器企业如何解决库存问题,希望给业内读者带来借鉴。  一、R公司库存管理现存的问题  R公司是国内起步较早、规模较大的热水器产品制造商,然而在近几年暴露
期刊
研究了在氮气保护下,紫外光照射,以二苯甲酮(BP)为光引发剂,苯乙烯磺酸钠在聚酯织物表面的接枝聚合。探讨了溶胀剂浓度、溶胀时间、紫外照射时间等反应条件对接枝效果的影响。用
期刊
(接上期第50页)3出口退税申报系统中的几个关键操作熟练掌握出口退税网络填报系统的各个录入环节很关键,下面介绍一些需要特别注意的操作。 (Continued on page 50) 3 Sever
期刊
期刊
期刊
期刊
期刊
期刊