本文主要介绍打破常规安装方法,根据实际情况,科学地设计安装进程,改变了工期长,局部反工现象,同时根据设备精度高,要求严的特点,抓主要矛盾,从而解决了300吨钢结构支架加工问题。关键部件四根存放振动装置立柱,保证加工精度找正安装。横梁利用角钢托架的办法,正确调整精度。埋设中心标板、机械部分排列编号,使之施工有序,保证安装质量。
This article mainly introduces breaking the conventional installation method, according to the actual situation, the design of the installation process scientifically, changing the long construction period, local anti-industrial phenomenon, at the same time, according to the characteristics of high precision equipment, strict requirements, grasp the main contradiction, thus solving the 300 tons of steel structure Scaffold processing problems. Four key components stored vibration device column, to ensure that the machining accuracy is to install. Cross beam bracket using the angle approach to correctly adjust the accuracy. Buried center standard board, machinery part of the serial number, so that the construction of an orderly, to ensure the quality of the installation.