地铁1号线工程是我市近期建设工程中规模最大, 影响面最宽的重点建设项目。由于该工程是集铁道工程、市政工程、建筑安装等工程为一体的综合性建设项目,工程档案内容比较多。为确保工程档案高质量的接收进馆,我馆安排二位同志专项负责,定时到现场对该工程档案整理归档工作进行指导服务并验收。为提前完成工程档案的整理工作,地铁公司联合我馆举办了由 15个参建单位,46人参加的集中现场指导、整理、验收专项会议,收到了预定的效果。历时4个月,35个工作日的指导服务,现已完成全部37个标段土建工程档案的验收,共计2500余卷档案已接收进馆。
Subway Line 1 project is the city’s recent construction projects in the largest and most influential area of key construction projects. As the project is a railway project, municipal engineering, construction and installation of integrated construction projects as one of the project file content more. In order to ensure the high-quality project archives received into the museum, we arranged for two comrades to be in charge of the project and to guide and check the archives of the project on time. In order to finish the work of arranging the project files ahead of schedule, the MTR Corporation jointly organized a special meeting with 15 participating units and 46 people to attend the centralized site guidance, sorting and acceptance and received the scheduled results. Lasted 4 months, 35 working days of the guidance service, has completed all 37 sections of civil engineering archives acceptance, a total of more than 2,500 volumes of files have been received into the museum.