为缓解德国不来梅市东南部住宅区的交通拥挤状况,决定在黑默林根修建一条隧道联络线。最初的计划是修建双孔隧道,每孔设双车道,并采用盾构法掘进。由于财政困难,目前打算改为单孔隧道,每一行车方向设一条行车道及一条避车道,并以明挖法施工。在决定采用单孔或双孔隧道方案时,就技术可行性、投资费用、维护费用、行车模式以及计划内和计划外交通干扰的影响进行了比较,并通过费用—效益分析进行了对比。
In order to alleviate the traffic congestion in the residential area in south-eastern Bremen, Germany, a tunnel tie-line was decided to be built in Hemerlingen. The original plan was to construct a two-hole tunnel with two lanes per hole and tunneling with a shield. Due to financial difficulties, it is currently planned to switch to a single-hole tunnel with a carriageway and an evacuation lane for each driving direction and construction by open cut method. When deciding on a single- or two-hole tunneling scheme, the technical feasibility, investment costs, maintenance costs, driving patterns, and the impact of planned and unplanned traffic disturbances were compared and compared using a cost-benefit analysis.