介绍了葛洲坝电厂电气二次设备安装、调试过程中所发现的技术隐患,并在此基础上分析了技术隐患产生的原因,从而阐述三峡左岸电厂电气二次设备安装、调试质量应控制的几个环节。
The technical problems discovered during the installation and commissioning of electrical secondary equipment in Gezhouba Power Plant were introduced. Based on the analysis, the causes of the technical risks were analyzed. The reasons for the installation of secondary electrical equipment in the Three Gorges Left Bank Power Plant Links.