论文部分内容阅读
现浇钢筋混凝土结构中,常常遇到梁与梁、梁与柱、梁与板相交的节点,而结构设计中大多是单个构件的绘制,对构件相交时钢筋的位置交待不清,有关构造要求也没有明确的规定。因此,实际施工中不少施工人员不能根据主次及受力情况正确处理,造成节点处钢筋错乱,影响结构的内力传递和节点处混凝土的浇筑质量。现举例分析如下:
In cast-in-situ reinforced concrete structures, often encountered are the beams and beams, beams and columns, beams and plates intersecting the nodes, and most of the structural design is the drawing of a single component. The position of the reinforcing steel bars at the intersection of the components is unclear. There is no clear rule. Therefore, many construction workers in actual construction cannot properly handle the problem according to the primary and secondary conditions and stress conditions, resulting in the disorder of reinforcement at the node, affecting the transmission of the internal forces of the structure and the quality of concrete pouring at the joints. An example analysis is as follows: