四川永荣矿务局双河煤矿地处川南供电系统末端,由一个110/35/6kV区域降压站以6kV向矿区供电。全矿有三对井口,均为极薄煤层,高沼气矿井,全矿核定年生产能力48万吨。近年来该矿在计划用电、节约用电、安全用电方面,做到领导重视,认识统一、措施具体、坚持不懈。收到了增产节电的经济效益,见下表。具体工作主要抓了以下十个方面。
Shuanghe Coal Mine of Sichuan Yongrong Mining Bureau is located at the end of the southern Sichuan power supply system and is powered by a 110/35 / 6kV regional buck station at 6kV. The mine has three pairs of wellheads, are extremely thin seam, high methane gas mines, the mine approved annual production capacity of 480,000 tons. In recent years, the mine has laid emphasis on leadership in planning electricity use, saving electricity and safe electricity, and has recognized the reunification with concrete measures and perseverance. Received the economic benefits of increasing production and saving electricity, as shown in the following table. Specific work focused on the following ten aspects.