论文部分内容阅读
本文介绍了东方电机有限公司为三峡地下电站提供的700MW水轮发电机蒸发冷却系统安装与调试技术,主要介绍了安装与调试过程中的工艺方法、注意事项以及相关标准,为规范后续大型水轮发电机组蒸发冷却系统安装的工艺方法及形成标准化的安装工艺提供参考。
This paper introduces the installation and commissioning technology of Evaporative Cooling System for 700MW Hydroelectric Generator provided by Dongfang Electrical Machinery Co., Ltd. for the Three Gorges Underground Power Station. It mainly introduces the process, precautions and relevant standards in the process of installation and commissioning. In order to standardize the follow- Generator evaporative cooling system installation process and the formation of a standardized installation process to provide a reference.