论文部分内容阅读
介绍了新疆某水电站工程的泄洪消能水工模型试验的研究成果,经反复试验研究,确定了消力池的池长,指出该池长设计的消能效果较好,为今后类似工程设计施工积累了经验。
This paper introduces the research results of flood discharge and energy dissipation hydraulic model test of a hydropower project in Xinjiang. After repeated experiments and studies, the pool length of the stilling pool is determined. It is pointed out that the design of the pool length has better energy dissipation effect and is suitable for the design and construction of similar projects Accumulated experience.