由珠委勘测设计研究院设计的世界银行贷款项目——珠江口门蕉门围垦开发工程(简称“蕉门项目”)进入最后实施阶段,目前施工单位正准备编写项目竣工报告。自1988年以来,珠委院先后完成了蕉门项目的立项、可行性研究和设计等阶段的工作,并参加世界银行对项目的审查和评估,1992年评估通过并开始实施。按世界银行要求,珠委院负责对堤围施工进行为期三年(1994年至1996年)的安全监测工作。由于实施前的准备工作做得充分,加上世界银行的正确指导和各级政府的大力支持,蕉门项目在五年多的实施中进展顺利。到目前为止,工程已投入人民币3亿
The World Bank loan project designed by Zhuhai Research Institute of Survey and Design - Pearl River Estuary Door & Door Reclamation Project (referred to as “Jiaomen Project ”) entered the final implementation stage. At present, the construction unit is preparing to complete the project completion report. Since 1988, the Commission has completed the construction of Banmen Project stages, feasibility studies and design stages and participated in the review and appraisal of the project by the World Bank. The assessment was passed in 1992 and started to be implemented. At the request of the World Bank, Zhuhai Committee is responsible for the safety monitoring of the embankment construction for a period of three years (1994-1996). Due to the pre-implementation preparatory work was done well, with the correct guidance of the World Bank and the strong support from all levels of government, the project banned the project to go smoothly in more than five years. So far, the project has invested 300 million yuan