论文部分内容阅读
附图是2AO_(13)H 气缸体六轴搪床改装成自动化以后的情况。当一按机床按钮接通电路时,电磁铁1就拉动气阀2向左移动,压缩空气进入送料气缸3右室,活塞杆4与带有单向活动拨爪6的送料杆5向左移动,把加工后的工件移到 A 处,将滚道上的毛坯拉到 b 处。杆5碰到气伐7以后,压缩空气进入操作定位销气缸8的左室,借连杆9的作用使定位销10、11插入工件定位孔中,然后压板13压紧工件并碰到行程开关14使动力头进刀。退刀后电
The figure is 2AO_ (13) H cylinder six-axis boring machine converted into automation after the situation. When a press machine button connected to the circuit, the electromagnet 1 to pull the valve 2 to the left, compressed air into the right cylinder feeding cylinder 3, the piston rod 4 and the feed lever 5 with a one-way movable claw 6 to the left , The workpiece after processing moved to A, the blank on the raceway to b Department. After the rod 5 hits the gas cutting 7, the compressed air enters the left chamber of the cylinder 8 for operating the positioning pin, and the positioning pins 10 and 11 are inserted into the workpiece positioning holes by the action of the connecting rod 9, and then the pressing plate 13 presses the workpiece and meets the limit switch 14 Power head into the knife. Power back after the knife