前言: 近年来,随着国民经济的迅速发展,为适应能源运输的需要,特别为解决晋煤南运和出口国外问题,建设大(大同)秦(秦皇岛)铁路运煤专用线,已列为“七五”国民经济发展计划的重点建设项目,目前正在建设之中。而秦皇岛港煤码头三期工程系这一建设项目的配套工程。本工程位于秦皇岛沙河口以西、距秦煤一、二期工程约2.5公里处的海岸地带。全港区占地面积约900亩,其中,耕地和荒地各占一半。设计抛石引堤长约846米,顶面有效宽
In recent years, with the rapid development of the national economy, in order to meet the needs of energy transportation, especially for solving the problem of transporting coal in south Shanxi and exporting abroad, the construction of a dedicated coal transportation line for the Qinhuangdao Railway of Datong (Datong) has been listed as The key construction projects of the “Seventh Five-Year Plan” for the national economic development plan are currently under construction. The third phase of Qinhuangdao Port Coal Terminal project of this construction project. The project is located west of Shahekou, Qinhuangdao, about 2.5 kilometers away from the first and second phase of Qin coal. The territory covers an area of about 900 acres, of which, each half of cultivated land and wasteland. Design riprap embankment about 846 meters, the top effective wide