论文部分内容阅读
文章分析了黄河头道拐站断面2012年9月洪水的水沙特性,并于1989年9月洪水的峰值进行了比较。
The paper analyzes the water and sediment characteristics of the flood in September 2012 in the section of the headwaters of the Yellow River Daoquitou and compares the flood peak in September 1989.