论文部分内容阅读
本文将一般供热系统供热方式优化问题概括为有容量约束的多地点、多设备、多产品的工厂布置问题,构造出相应的混合0-1整数规划模型。对优化模型中涉及的热源费用和供热管网费用的计算方法作了说明。扼要介绍了求解优化模型的反向跟踪分支限界算法。
This paper summarizes the heating system optimization problem of general heating system as a multi-site, multi-equipment and multi-product factory layout problem with capacity constraint, and constructs the corresponding mixed 0-1 integer programming model. The calculation method of heat source cost and heating pipe network cost involved in the optimization model are described. A brief introduction of the algorithm of solving the optimization model of back tracking branch and bound.