论文部分内容阅读
在板溪群五强溪组Ptbnw2复杂地质条件下,在高薄拱坝设计研究中大胆采用有闸控制的大孔口泄流方式,消能方式得到模型试验验证,溢洪道安全性经“2010.6.17”超百年一遇洪水实践证明,方案可靠。
Under the complex geological conditions of Ptqnw2 in Wuqiangxi Formation of Banxi Group, the large orifice discharge with brake control is boldly used in the design and research of the high-arch dam. The energy dissipation mode is validated by model tests. The safety of the spillway is verified by “2010.6 .17 ”Ultra-centennial flood practice has proved that the program is reliable.