Evaluation of the Performance of the GSSM Under Vibration Based on Normalized Point Source Sensitivi

来源 :Journal of Harbin Institute of Technology | 被引量 : 0次 | 上传用户:JK0803_chenjianchao
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
Giant Steerable Science Mirror( GSSM) is the tertiary mirror of the Thirty Meter Telescope( TMT).To evaluate the performance of the GSSM under the mechanical vibration,the Normalized Point Source Sensitivity( PSSn) is used to understand and characterize the optical performance degradation. First and foremost,the definition of the PSSn is shown and the calculation procedure of the PSSn at the work condition where the telescope aberration is much smaller than seeing is presented to reveal the relationship between PSSn and seeing.Then,the optical degradation due to vibration is achieved by the two methods: one is the statistics moment for the arbitrary froms of vibration and other one is spectrum method for wind load. After the theoretical presence,the simulation is processed. The multi-axis-accelerometers are used to achieve the motion of the mirror. After integrated to displacement signal,the measured signal is applied to the mathematical model of the GSSM and the optical performance degradation under certain mechanical vibration can be achieved. The PSSN flows from 0.996 to 0.994 under some dynamic vibration. And then,the wind load is applied to the mathematical model using spectrum method with the PSSN flows from 0.996 to 0.991. This paper can help the system engineers to predict the performance of the GSSM in various work condition. What is more,PSSn is able to be combined just by simple multiplication,so the optical performance degradation can be easily co-considered with other error sources. Giant Steerable Science Mirror (GSSM) is the tertiary mirror of the Thirty Meter Telescope (TMT). To evaluate the performance of the GSSM under the mechanical vibration, the Normalized Point Source Sensitivity (PSSn) is used to understand and characterize the optical performance degradation . First and foremost, the definition of the PSSn is shown and the calculation procedure of the PSSn at the work condition where the telescope aberration is much smaller than seeing is revealing the relationship between PSSn and seeing. Chen, the optical degradation due to vibration is achieved by the two methods: one is the statistics moment for the arbitrary froms of vibration and the other one is spectrum method for wind load. The multi-axis-accelerometers are used to achieve the motion of the mirror. After integrated to displacement signal, the measured signal is applied to the mathematical model of the GSSM and the optical performance de The PSSN flows from 0.996 to 0.994 under some dynamic vibration. And then, the wind load is applied to the mathematical model using spectrum method with the PSSN flows from 0.996 to 0.991. This paper can help the system engineers to predict the performance of the GSSM in various work conditions. What is more, PSSn is able to be combined just by simple multiplication, so the optical performance degradation can be easily co-considered with other error sources.
其他文献
The glancing angle deposition(GLAD)method is a kind of physical vapor deposition and many kinds of self-standing nanostructured materials can be prepared.Here w
The effects of shape memory alloy( SMA) wires on the natural frequency,flutter boundary and amplitude of limit cycle oscillation( LCO) of a laminated composite
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
Recent advances in the application of the nonlinear energy sink under a sinusoidal excitation make it possible to investigate metal-rubber vibration absorber. T
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
An automatic intelligent system for the colour and texture inspection of bakery products is proposed.In this system,advance classification technique featuring Support Vector Machine and biologically i
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥