论文部分内容阅读
唐山一带7.8级大地震波及我市,我市烈度达6~7度。震后,在市委的领导下,我局积极组织了修复加固,在解放军基建工程兵和我市基建施工单位的支援下,在街道居民和机关学校的配合下,发动群众,依靠群众,大打人民战争,在短短的两个月内,已修复加固楼房占受损楼房总数的40%,取得了抗震救灾的初步胜利。本文对于砖结构楼房的震后修复加固方法,作扼要的介绍。尽管影响砖结构房屋震
The 7.8-magnitude earthquake in Tangshan affected the city. The intensity of the city reached 6-7 degrees. After the earthquake, under the leadership of the municipal party committee, the bureau actively organized repairs and reinforcements. With the support of the PLA’s infrastructure engineering and construction units of the city’s infrastructure, and with the cooperation of street residents and government agencies, the masses were launched, relying on the masses, and hitting the people. In the war, in only a short period of two months, the reinforced buildings accounted for 40% of the total number of damaged buildings, and an initial victory in the earthquake relief work was achieved. This article gives a brief introduction to the post-earthquake repair and reinforcement methods for brick-structured buildings. Although the impact of brick structure housing earthquake