论文部分内容阅读
2002年以来,电力行业为适应我国社会主义市场经济的发展,不断进行着电力体制的深化改革,目前已基本实现了厂网分开,重组了发电和电网企业,打破了垂直一体化管理和垄断经营体制,新的管理模式尚在探索之中。这种新形势给电力可靠性管理工作带来了更广阔的发展空间,同时也使可靠性管理工作面临着前所未有的复杂局面和挑战。可以说,电力可靠性管理工作进入了“第二次创业”的阶段。如何尽快适应新形势,建立符合新的电力管理模式的可靠性管理体系,以保证可靠性工作继续深入开展,是电力行业面临的一项严峻任务。为此,2004年10月28日,中电联在浙江绍兴召开了全国电力可靠性管理工作会议,对如何推动电力可靠性管理工作的深入开展,使电力可靠性管理工作在新体制下更好地为提高电力企业的管理水平和经济效益服务进行了认真、深入、广泛的探讨。
Since 2002, in order to meet the development of the socialist market economy in our country, the power industry has been carrying out the deepening reform of the power system. At present, the power grid and power grid enterprises have been basically separated and the vertically integrated management and monopoly management have been broken System, the new management model is still under investigation. This new situation has brought a broader space for the development of power reliability management, at the same time, it has also led to unprecedented complexity and challenges in reliability management. It can be said that the management of power reliability has entered the “second pioneering” stage. How to adapt to the new situation as soon as possible and establish a reliability management system that conforms to the new power management mode so as to ensure that the reliability work continues to be carried out in depth is a serious task facing the power industry. To this end, on October 28, 2004, CEC held a national power reliability management conference in Shaoxing, Zhejiang Province, which is conducive to furthering the management of power reliability and making power reliability management better under the new system In order to improve the management level of power enterprises and economic benefits of services conducted a serious, in-depth and extensive discussion.