十多年来,在天津新港软土地区已建成十几座高桩码头的深水泊位。为了利用深层硬基的承载力,考虑砂石来源困难和单价昂贵的具体情况,结合现有施工机具设备的条件,这些泊位采用岸坡自身稳定的宽桩台结构型式。根据施工实践来看,宽桩台结构型式所需的基桩和上部构件的予制工程最大,现有的予制能力已远远不能满足需要。前方桩台采用的
For more than a decade, more than a dozen deep-water berths have been built in the soft soil area of Tianjin’s Newport. In order to make use of the bearing capacity of deep hardbase and consider the specific conditions of difficult source and high price of gravel, the berths adopt the self-stable wide-pile structure of bank slope in combination with the conditions of existing construction equipment. According to the construction practice, the precast construction of the foundation piles and upper components needed for the structure of wide piles is the largest, and the existing pre-existing capacity is far from meeting the needs. Used in front of pile table