论文部分内容阅读
加热炉原料、装钢、出钢岗位,负责钢坯的输送。原料根据MES系统信息将上线钢坯信息传递给L1系统;装钢负责将辊道上的钢坯定位到目的道次,并装入加热炉内;出钢负责加热炉的步进、出钢,并将钢坯输送至除鳞机。加热炉装出钢过程自动化控制,对加热炉的整个生产流程进行自动化管理、控制,实现了加热炉区的装出钢全自动生产。
Furnace heating, loading steel, tapping post, responsible for the billet delivery. The raw materials are sent to the L1 system according to the MES system information; the loading steel is responsible for locating the billet on the roller conveyor to the destination pass and loading into the heating furnace; the tapping is in charge of stepping and tapping of the heating furnace and the billet Conveying to descaler. Heating furnace equipped with steel automation control process, the entire heating furnace production processes for automated management, control, to achieve the heating furnace area installed steel automatic production.