论文部分内容阅读
2005年,王敏被认命为国电大家水力发电厂的厂长。上任后不久,他便遇到了一系列棘手却又亟待解决的问题。增发电量困难巨大、安全生产基础不牢固、细
In 2005, Wang Min was named as a director of a hydroelectric power plant in China. Shortly after taking office, he encountered a series of difficult but urgent problems to be solved. It is very difficult to generate additional electricity, and the foundation of production safety is not strong and fine