论文部分内容阅读
该文阐述十字板剪切试验具体操作及后期资料整理,结合罗源湾下杭河河道整治工程地质勘察过程实践,分析淤泥十字板剪切试验结果,供参考。
This paper describes the specific operation of the cross-shear test and the finishing of the data. Combined with the practice of the geological survey of the river course of Xiahang River in Luoyuan Bay, the results of the shear test of the silt cross-slab are analyzed for reference.