我省1965年在武汉市近郊公路上,铺筑了20公里的渣油路面,其中石灰土和级配碎石补强层各10公里。希望通过生产实践,学习各地成功经验,探讨渣油表处和石灰土在武汉多雨、潮湿、炎热地区的适应性能,初步提出各顶材料的技术指标和工艺过程,为在我省继续推广渣油表处和石灰土路面创造条件。该项工程于5月份开工,在各级党委的正确领导和交通部长沙公路工程研究所的具体指导下,于10月份完工,质量基本良好。现将施工情况和初步体会介绍如下,以供参考。
On the outskirts of Wuhan in 1965, our province paved 20 kilometers of residual oil pavement, of which limestone and graded macadam reinforcement 10 km each. Hope that through the practice of production, learn from the successful experience of various places to explore the residual oil surface and lime soil in Wuhan rainy, humid and hot areas of the adaptive performance of the preliminary proposed technical indicators and the top material of the process, in our province to continue promoting the residual oil Table and limestone pavement to create conditions. The project started in May and was completed in October with the correct guidance of the Party committees at all levels and the specific guidance of the Changsha Highway Engineering Institute under the Ministry of Communications. The quality is basically good. The construction situation and the initial experience are introduced below, for reference.