铜街子水电站首台机组安装历经332天,在9月10日启动,微机监控系统同步投入,进行各项调整试验,并在额定出力下甩负荷成功。由于轴承推力高达
The first unit of Tongjiezi Hydropower Station was installed for 332 days and was started on September 10. Simultaneously, the microcomputer monitoring system was put into operation to carry out various adjustment tests, and the load rejection succeeded at rated output. As the bearing thrust up