成都热电厂粉煤灰厂自1989年成立以来,为成都市墙体材料的改革贡献了力量。目前,该厂技改造开发的20个粉煤灰烧结砖厂已全部投入生产,形成年产3亿块新型墙体材料——粉煤灰烧结砖的生产能力。有力地促进了成都市墙体材料的改革。该厂从推广应用粉煤灰烧结砖的过程中体会到,改造现有砖厂是粉煤灰综合利用投资省、工期短、见效快的有力措施。改造一个年产1500万块标砖的砖厂,只需投资技改费7至9万元左右。国家要建一个与20个砖厂同等吃灰量的砖厂,要投资2000至3000万
The Chengdu Thermal Power Plant’s fly ash plant has been established since 1989 and has contributed to the reform of Chengdu’s wall materials. At present, 20 fly ash fired brick plants have been put into production, and the annual production capacity of 300 million new-type fly ash fired bricks has been formed. Effectively promoted the reform of Chengdu’s wall materials. The plant learned from the process of promoting the use of fly ash fired bricks, and the transformation of the existing brick works is a powerful measure for the comprehensive utilization of fly ash, investment, short construction period, and quick results. To transform a brick factory with an annual output of 15 million bricks, only investment in technical reform costs 7 to 9 million. The state must build a brick factory with the same amount of ash as 20 brick factories, and invest 2,000 to 30 million.