一九七四年,我们曾在郑州市金水河桥采用冷拔低碳钢丝后张自锚予应力混凝土工艺。其设计、施工及单片梁荷载试验已总结于《公路预应力桥梁中采用冷拔低碳钢丝热处理和成束自锚工艺》一文内(《中南公路工程》)1975年第三期)。该桥系城市宽桥,上部构造由15片带中横隔板的T型梁组成。计算跨径12.5米,桥宽32米。为了解桥宽受力性能和特点,进行了原型静载试验。试验资料整理时,我们选用多种方法(包括JLBGQ—77程序电算)进行计算对比和粗浅的分
In 1974, we used self-anchored post-tensioned low carbon steel wire to stress concrete process in Jinshui River Bridge in Zhengzhou City. Its design, construction and monolithic beam loading tests have been summarized in the article “Central South Highway Engineering”, 1975, No. 3, “Heat Treatment of Cold-Drawn Low Carbon Steel Wires and Beam Self-anchoring Processes in Prestressed Bridges of Highways”. The bridge is a city wide bridge, the upper structure consists of 15 with T-shaped beam in the diaphragm. Calculate the span of 12.5 meters, 32 meters wide bridge. In order to understand the mechanical properties and characteristics of the bridge, a prototype static load test was carried out. When testing the data, we use a variety of methods (including the JLBGQ-77 program) to calculate the contrast and superficial points