漳卫新河排水涵洞几个技术问题的初步分析

来源 :海河水利 | 被引量 : 0次 | 上传用户:wenzhiqiang963
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
一、前言我县于七三年在漳卫河左岸共修建排水涵洞九座,其结构型式为钢筋混凝土园涵,孔径1.5米,排水流量1.5~3.2秒立米,折合单管洞身总长445米,总投资30万元。七四年汛前,对所有涵洞进行了检查,发现洞顶均出现纵向(顺水流方向)裂缝,其宽度为0.4~1毫米,到七六年已发展到0.5~1.5毫米。 I. Preface Our county built a total of nine drainage culverts on the left bank of the Zhangwei River in 1993. The structure type is reinforced concrete garden culvert with a hole diameter of 1.5m and a drainage flow rate of 1.5 to 3.2seconds, equivalent to a total length of 445m , A total investment of 300000 yuan. Before the flood season of 1974, all the culverts were inspected and cracks in the vertical (along the water flow direction) were found on the top of the culvert. The width of the culverts was 0.4-1 mm and reached 0.5-1.5 mm by 1976.
其他文献
本文所介绍的沁河杨庄改道工程,是解决沁河木栾店河段堤防标准不足及急弯卡口阻水险势,确保沁河下游防洪安全,防止沁、黄并溢危及华北平原的重要设施。文内介绍了工程的兴建
粉煤灰是发电厂的废渣,如不利用,即成公害。用70%的粉煤灰、20%的消石灰、10%的半水石膏、0.5%的磷酸和45%的水,制成料浆,成型,并在蒸气温度为97℃时养护15小时,则硬化体的
胜利油田通过对水平井工程设计、完井、测井等技术及配套工具的研究, 形成了适合不同地区、不同油藏类型的水平井钻井及配套技术,该技术在胜利油田和其他油田推广应用并取得了
目的:分析17例小儿纵隔肿瘤的X线与CT检查结果,重点讨论胸部平片与CT检查的价值。材料和方法:17例患儿的年龄为11个月~14岁,全部做了胸部X线平片及CT扫描检查,并均经临床检查/手术病
小儿恶性肿瘤的发生率逐渐上升,虽然随着手术、化疗和放疗等治疗技术的提高,恶性肿瘤患儿的生存率有较大提高,但其治疗效果仍不理想,尤其是放疗、化疗的毒副作用导致治疗失败和后
随着现代社会对人才的要求越来越高,一种新型人才培养模式应运而生——工学结合,即将工作和学习相结合工学结合。高职会计专业适应要想进行专业改革,推行工学结合人才培养模
五、下料零件加工及小组装 1.下料时应注意的事项 (1)准备下料用的工具,如画针、画规、手锤、园冲,粉线和油漆等; (2)检查样板有无变形; (3)检查材料是否有裂纹、夹层、板材
传染性单核细胞增多症尚无特异性疗法,为探讨α-干扰素对本病的治疗效果,现将我院近2年诊断明确的58例患儿总结如下。 临床资料 一、诊断标准 (1)具有发热、咽峡炎、淋巴结
使用塔板理论证明存在一种使正常色谱峰产生拖尾的因素──柱出口效应。证明符合线性分 配的样品组分虽然在色谱柱内存在3种不同浓度的分布形态,但在流出色谱柱后却都因柱出口