洛阳首阳山电厂现有装机104万千瓦,规划装机容量为220万千瓦,分三期建设。其中一期工程两台20万千瓦机组1988年投产,二期工程两台30万千瓦机组1996年投产。三期工程两台60万千瓦机组正在筹建中。2000年9月,被国家电力公司命名为“一流火力发电厂”。 我厂多种经营从1987
Luoyang Shouyangshan Power Plant has an installed capacity of 1.04 million kilowatts and a planned installed capacity of 2.2 million kilowatts, which is constructed in three phases. In the first phase of the project, two 200,000-kilowatt units were put into operation in 1988, and two 300,000-kilowatt units were put into operation in 1996. In the third phase of the project, two 600,000-kilowatt units are under preparation. In September 2000, it was named by the State Power Corporation as “a first-class thermal power plant.” I plant a variety of operations from 1987