在现代化施工尤其是在钢结构施工过程中为了提高机械化施工的效益、质量,最终实现施工效益的最大化、施工过程的合理化、施工水平的现代化的目标。钢结构施工机械动态作业定额体系以钢结构施工中焊缝的计算长度为出发点,在保证焊缝的质量要求的前提下,通过对各个设备的效率和时间利用系数的计算来确定每台班的工作定额,并根据当前施工状况动态的分配施工机械设备,通过改变联合作业系数、环境影响系数来实现既定的目标。
In the modern construction, especially in the process of steel structure construction in order to improve the efficiency and quality of mechanized construction, the ultimate realization of construction efficiency maximization, construction process rationalization, construction level modernization goal. Based on the calculated length of the weld in the construction of steel structure, under the premise of ensuring the quality of the welding seam, the dynamic work quota system of the steel structure construction machine is determined by calculating the efficiency and time utilization coefficient of each equipment Work quota, and dynamically allocate construction machinery and equipment according to the current construction conditions, and achieve the established goal by changing the joint operation coefficient and environmental impact coefficient.