论文部分内容阅读
秦皇岛油港原油二期工程,考虑与拟建煤港综合利用,决定采用防波堤方案。模型试验表明,从口门进来的波浪由于东北堤及东堤墙前反射,对已建成的原油一期泊位的泊稳条件影响是严重的(平面位置详见图一)。为了克服这个缺点,在新建二期油工程中,经过几种结构形式的比较,最后采用了带消浪室的沉箱结构方案。整体模型试验证明,这种结构形式对一定
Qinhuangdao Oil Port Crude Phase II Project, considering the proposed comprehensive utilization of coal mines, decided to adopt the breakwater program. The model tests show that the waves coming in from the mouth are seriously affected by the reflection of the northeast bank and the front wall of the east bank, which has a serious influence on the stability of the berths of the first phase of the crude oil (Figure 1). In order to overcome this shortcoming, in the second phase of the new oil project, after several comparison of the structural forms, finally adopted a caisson structure with a waste chamber. The overall model test proves that this kind of structural pair must be certain