论文部分内容阅读
通过坝基地质条件和水文地质条件分析,对坝基渗漏量进行了计算,评价了坝基水文地质工程地质条件。帷幕灌浆,既消除了大坝隐患,也减少了水资源的浪费。
Through the analysis of the geological conditions and hydrogeological conditions of the dam foundation, the leakage of the dam foundation was calculated and the hydrogeological engineering geological conditions of the dam foundation were evaluated. Curtain curtain grouting, both to eliminate the hidden dangers of the dam, but also to reduce the waste of water resources.