三明钢铁厂3号高炉(300m~3)1996年产铁198006.606t,利用系数1.826t/(m~3.d),入炉焦比539kg/t铁,炼钢铁品种达到91.58%,铁水含Si为0.91%,创投产以来最好生产水平。 3号高炉于1977年11月开工,1985年11月建成投产,投资2274.83万元,设计能力:使用D800型风机,日产铁600t,年产铁21万t;使用D1000型风机,日产铁700t,年产铁25万t。该炉自1985年到1996年共产铁1806561.8t,1996年产铁198007t,为最高年产量,最低144727t,11年平均产量163050.25t。历年产量与入炉焦比如下。
Ironmaking blast furnace (300m ~ 3) produced 198006.606t of iron in 1996 with a utilization factor of 1.826t / (m ~ 3.d) into a furnace coke ratio of 539kg / t iron with a steelmaking grade of 91.58% 0.91%, the best production level since its launch. The blast furnace No.3 was started in November 1977 and completed and put into production in November 1985 with an investment of 22.7483 million yuan. The designed capacity is to use D800-type wind turbines with an annual output of 600 tons of iron and an annual output of 210,000 tons of iron. The D1000- With an annual output of 250,000 t iron. The furnace from 1985 to 1996, 1806561.8t total iron, iron production in 198007t in 1996, the highest annual output, the lowest 144727t, 11-year average output of 163050.25t. Calendar output and into the furnace coke ratio as follows.