论文部分内容阅读
1 前 言岭澳水库是广东省大亚湾核电站的供水水库 ,坝型为均质土坝 ,坝高 58.5m.1 995年 1 1月开始施工 ,1 996年 9月建成蓄水 .随着水库蓄水位的抬高 ,漏水量与库水位基本成比例增大 ,坝后坡出现 5片洇湿明流区 ,坡角出现管涌冒沙 ,当库水位达 76.91 m时 ,浸润线出逸点高程
1 Introduction Ling’ao Reservoir is a water supply reservoir for Daya Bay Nuclear Power Station in Guangdong Province. The dam type is a homogeneous earth dam with a height of 58.5m. It started construction in January 1995 and was completed in September 1996. As the reservoir water Bit elevation, the amount of water leakage and the reservoir water level increases in proportion to the basic, there are 5 dam Hou wet Mingliu area, the slope angle of the pipe appear to run the sand, when the reservoir water level reached 76.91 m, infiltration line escape point elevation