在76年6~11月利用1~#高炉大修的间隙对槽下上料设备进行了彻底改造。取消了行车、称量车,撤除了信号室,代之以链板机、皮带机、电动翻板、电子称,实现了远距离集中控制操作。把操作工人从繁重的体力劳动和粉尘环境中解放出来,人工操作全部改成电动操作,大大减轻了劳动强度,改善了劳动条件。操作岗位由四个减少到一个,操作工人由原来每班10人减少为每班五人。并为实现全部自动化奠定了基础。现将槽下上料系统
In June 2006 to November use 1 ~ # Blast furnace overhaul of the gap under the feeding equipment has been completely transformed. Canceled the traffic, weighing the car, removed the signal room, replaced by chain plate machine, belt machine, electric flap, said electronic, to achieve a long-distance centralized control operations. The operating workers from the heavy manual labor and dust environment liberated, all the manual operation into electric operation, greatly reducing the labor intensity and improve the working conditions. The number of operational posts has been reduced from four to one, and the number of operational workers has been reduced from 10 for each shift to five for each shift. And laid the foundation for all automation. Now slot under the feeding system