论文部分内容阅读
一、工程及施工人员概况摩苏尔坝(Mosul dam)位于伊拉克东北部底格里斯河上,距首都巴格达500多公里。发电部分由一个装机容量为4×17万千瓦坝旁引水式电站和一个2×10万千瓦抽水蓄能电站以及一个3×1.5万千瓦灯泡式机组电站组成,总装机容量达92.5万千瓦。金属结构制造、安装一万余吨。该工程为联邦德国和意大利联合组成的Gimod跨国公司承包,金属结构分包给联邦德国和奥地利
First, the construction and construction personnel profile Mosul Dam (Mosul dam) is located in northeastern Iraq on the Tigris River, 500 kilometers away from the capital Baghdad. The power generation section is composed of a 4 × 170MW dam next to the water diversion power station and a 2 × 10MW power plant and a 3 × 15MW bulb-type power plant with a total installed capacity of 925,000 kilowatts. Metal structure manufacturing, installation of more than 10,000 tons. The project was contracted by a joint Gimod multinational corporation comprising the Federal Republic of Germany and Italy, subcontracting the metal structures to the Federal Republic of Germany and Austria