(三)枢纽布置方案的论证根据三峡工程论证领导小组第三次(扩大)会议的要求和关于可行性论证阶段仍按明渠通航方案考虑的指示,以及论证领导小组第四次(扩大)会议确定的论证工作初选水位方案,长办于1987年9月编制了《三峡水利枢纽正常蓄水位175米枢纽布置方案论证报告》,拟定了两岸坝后厂房、三组厂房、右岸溢流厂房三类枢纽布置方案,其中永久通航建筑物均布置在左岸,且采用连续五级船闸Ⅰ线方案。三类枢纽布置方案是: 方案Ⅰ、两岸坝后厂房方案河床中部布置泄洪坝段,两侧布置坝后式厂房。左侧厂房设有14台68万千瓦机组,右侧设有12台68万千瓦机组。泄洪坝段长483米,主
(III) Argumentation of the Layout Scheme According to the requirements of the Third (Expansion) Meeting of the Leading Group for the Three Gorges Project Demonstration and the directives still under consideration of the open channel navigation program at the feasibility demonstration stage and the demonstration of the fourth (enlarged) meeting of the Leading Group Of the demonstration work of the preliminary election water level program, the long Office in September 1987 prepared a “Three Gorges Water Diversion Normal 175 meters hub layout program demonstration report”, formulated the dam after the two plants, three plants, right bank overflow plant three Class hub layout scheme, of which permanently navigable buildings are arranged on the left bank, and the continuous five-stage lock Ⅰ scheme. Three types of hub layout scheme is: Scenario I, the two sides of the dam after the plant plan layout flood discharge dam section in central, both sides of the layout of dam-style plant. The left plant has 14 sets of 680,000 kilowatts units, the right side has 12 sets of 680,000 kilowatts units. Flood discharge dam length of 483 meters, the main