摘要:先浇混凝土,待混凝土达到设计强度75%以上,再张拉钢筋(钢筋束).其主要张拉程序为:埋管制孔→浇混凝土→抽管→养护穿筋张拉→锚固→灌浆(防止钢筋生锈).其传力途径是依靠锚具阻止钢筋的弹性回弹,使截面混凝土获得预压应力,这种做法使钢筋与混凝土结为整体,称为有粘结预应力混凝土.
关键词:后张法有粘结预应力钢绞线灌浆
Abstract: the first site concrete, concrete design strength to stay above 75%, again drawing reinforced (reinforced beam). Its main tension procedures for buried control and site concrete hole, a tube wear, maintenance of tension bars-anchor and grouting (to prevent reinforced rust). The power transmission way is to rely on the anchorage stop the elasticity of the reinforced rebound, make section for concrete compressive pre-stress, this approach to make the whole of steel and concrete, called bonded prestressing concrete.
Key words: this method, have the unbonded prestressed concrete, steel strand, grouting
中图分类号:TU74文献标识码:A 文章编号:
1、引言
在工程结构构件承受外荷载之后,对受拉模块中的钢筋,施加预压应力,提高构件的刚度,推迟裂缝出现的时间,增加构件的耐久性,其好处是可以提高构造本身刚性,减少振动和弹性变形这样做可以明显改善受拉模块的弹性强度,使原本的抗性更强。
2、工程概况
我们承建的商业办公酒店工程,总用地面积34424平米,总建筑面积为185953平米,其中地上建筑面积为137693平米,地下建筑面积为48260平米,地下二层为地下停车场和设备间,地下一层为地下超市、停车场和餐厅及娱乐场所,地上层高为23~26层,部分1~5层为商业办公用房,地上部分檐口高度为91.1m。其中只有A座和B座之间的网球场和F座北侧的演艺厅上空采用有粘结预应力混凝土结构,预应力钢筋用于控制结构的温度及受弯应力。预应力梁混凝土强度等级C40。梁中预应力筋采用1860级(国标GB/5224-2003)高强低松弛钢绞线,公称直径d=15.20mm(7股),单根截面积为140mm2。有粘结预应力结构张拉端采用夹片锚具,固定端采用P型锚具,预埋塑料波纹管,波纹管内钢绞线12-9根即:1-(12—9)×φs15(7φ5)。设计张拉控制应力 s =0.70f 。
3、施工工艺
本工程预应力混凝土采用有粘结预应力结构,有粘结预应力梁施工的整体施工工艺需要综合考虑钢绞线下料,模板支设,铺设普通钢筋,铺设支架钢筋,铺设预应力筋,张拉端锚具埋设,隐蔽工程验收,浇捣混凝土以及混凝土强度达到强度后的张拉,灌浆等一系列的流程操作。
1、钢绞线下料
按细部设计图纸计算下料长度,计算下料长度时应综合考虑构件的孔道长度,锚具厚度,张拉伸长值,构件的弹性压缩值以及张拉时所需的工作長度等,下料长度(L)的公式如下:
L=l+2h+l1+l2
式中:l…孔道曲线长度
h…锚垫板厚度
l1…张拉端千斤顶的工作长度
l2…固定端纲绞线露出锚具的长度,若为两端张拉,则为另一张拉端千斤顶的工作长度。
在平坦干燥的场地上直接用砂轮切割机逐根断料,不得使用气割或电焊切割。同一束孔道内的钢绞线长度基本相同,对不同束、不同长度规格的钢绞线按预应力梁号进行分类编号。
2、固定端P型挤压锚制作
固定端的钢绞线需用专用挤压机制造固定端挤压锚具,严格控制挤压锚具制作质量,挤压时油表压力应在3~60Mpa之间。
3、预应力梁有粘结预应力筋铺放
铺设底板,绑扎骨架钢筋:一般情况下在绑扎完成上下单排主筋和箍筋(开口箍筋)后,就可以穿插进行预应力筋的制作。预应力梁应预留两侧侧模(至少预留一侧模板),在波纹管铺设完毕后再封两侧侧模。
在完成全部钢筋绑扎工作和预应力铺放工程结束后,应进行隐蔽工程的验收,当业主、监理确认合格后方能浇捣砼。
4、浇捣混凝土
浇灌混凝土时应绝对避免振动棒强力撞击波纹管,以防止振动棒将波纹管凿破后漏浆。张拉端、固定端处钢筋较为集中,混凝土浇捣必须注意振捣密实。砼浇捣时,施工人员应严禁踏压或撞碰波纹管,同时应注意端部和钢筋较密处砼的密实性,防止发生空洞现象。
5、预应力筋张拉
在预应力筋张拉前首先应进行设备标定,千斤顶、油泵配套标定采用误差<1%的液压式压力试验机进行标定。预应力筋张拉时,结构的混凝土强度应不小于强度等级的80%。并且张拉前对构件端部预埋件、灌浆孔、混凝土等进行全面检查。
6、锚具保护
有粘结预应力张拉完后,采用手提式切割机或其它机械方式切割多余钢绞线,露出锚具外的钢绞线长度应为20~30mm。用C40 级细石砼封闭锚具夹片与外露钢铰线。
7、孔道压浆
预应力张拉完成后两天内及时进行灌浆,并在灌浆前做好相应的试验工作。 孔道灌浆应采用不低于425号普通硅酸盐水泥配制的水泥浆。所用水泥必须符合国家有关标准规定,不得含有结块物,其中水泥浆水灰比0.4~0.45,水泥浆应保证有足够的流动性。水泥浆流动度宜根据气温条件控制在14~20 秒之间,并应在 40min内流动度无大变化。
4、质量通病及预防处理方法
本工程预应力长索较多,这会造成较大的预应力摩擦损失。而且,因为预应力索很长,在张拉过程当中,预应力筋的伸长受到摩擦阻力的约束,远离张拉端的那一段钢铰线伸长不可能在张拉过程当中迅速完成,需有一定的时间过程来克服摩擦阻力。所以,在预应力张拉施工过程中,张拉的速度不能太快,应该匀速、缓慢地张拉,给钢绞线克服摩擦阻力一定的时间。除此以外,在张拉到控制应力时,还应该持荷一段时间,让钢绞线慢慢地克服摩擦阻力,完成伸长过程。持荷过程结束以后,钢铰线束的应力会有所降低,这时,需要再进行补拉,使应力达到бk持荷的时间,一般应控制在2~5分钟以上。
长孔道的压浆问题,是预应力结构质量控制的关键问题之一。由于预应力孔道内的压浆情况是看不到、摸不着的过程,如果压浆不密实,外表很难看出来,但是对结构的耐久性却影响很大,对于本工程的长预应力孔道压浆,需要仔细地进行水泥浆试配。首先,水泥浆在 1.725L 漏斗中,其稠度应为 14~20 秒;其次,水泥浆的凝固时间应该在 1.5 小时以上。
为了保证长孔道的张拉与压浆质量,要严防在混凝土振捣过程中把波纹管振破,造成孔道漏浆。因此,对于两端张拉的预应力钢绞线,当混凝土浇捣完毕半个小时以后,应该将每束钢铰线轻轻地在管道中进行推拉。如果钢铰线可以顺利地抽动,说明孔道内无漏浆现象;如果无法抽动、或者很难抽动,说明孔道中有漏浆现象发生,应尽快查明漏浆部位,在混凝土没有结硬之前尽快处理。
6、总结
后张法有粘结预应力混凝土施工,提高了构件的刚度,推迟裂缝出现的时间,增加构件的耐久性,可以提高构造本身刚性,减少振动和弹性变形这样做可以明显改善受拉模块的弹性强度,使原本的抗性更强。
参考文献
1、《混凝土结构设计规范》(GB50010——2010)
2、《预应力混凝土用钢绞线》(GB/T5224)
3、《混凝土结构工程施工及验收规范》(GB50204-2002)
作者简介:谭光华1969年10月2日中级工程师
关键词:后张法有粘结预应力钢绞线灌浆
Abstract: the first site concrete, concrete design strength to stay above 75%, again drawing reinforced (reinforced beam). Its main tension procedures for buried control and site concrete hole, a tube wear, maintenance of tension bars-anchor and grouting (to prevent reinforced rust). The power transmission way is to rely on the anchorage stop the elasticity of the reinforced rebound, make section for concrete compressive pre-stress, this approach to make the whole of steel and concrete, called bonded prestressing concrete.
Key words: this method, have the unbonded prestressed concrete, steel strand, grouting
中图分类号:TU74文献标识码:A 文章编号:
1、引言
在工程结构构件承受外荷载之后,对受拉模块中的钢筋,施加预压应力,提高构件的刚度,推迟裂缝出现的时间,增加构件的耐久性,其好处是可以提高构造本身刚性,减少振动和弹性变形这样做可以明显改善受拉模块的弹性强度,使原本的抗性更强。
2、工程概况
我们承建的商业办公酒店工程,总用地面积34424平米,总建筑面积为185953平米,其中地上建筑面积为137693平米,地下建筑面积为48260平米,地下二层为地下停车场和设备间,地下一层为地下超市、停车场和餐厅及娱乐场所,地上层高为23~26层,部分1~5层为商业办公用房,地上部分檐口高度为91.1m。其中只有A座和B座之间的网球场和F座北侧的演艺厅上空采用有粘结预应力混凝土结构,预应力钢筋用于控制结构的温度及受弯应力。预应力梁混凝土强度等级C40。梁中预应力筋采用1860级(国标GB/5224-2003)高强低松弛钢绞线,公称直径d=15.20mm(7股),单根截面积为140mm2。有粘结预应力结构张拉端采用夹片锚具,固定端采用P型锚具,预埋塑料波纹管,波纹管内钢绞线12-9根即:1-(12—9)×φs15(7φ5)。设计张拉控制应力 s =0.70f 。
3、施工工艺
本工程预应力混凝土采用有粘结预应力结构,有粘结预应力梁施工的整体施工工艺需要综合考虑钢绞线下料,模板支设,铺设普通钢筋,铺设支架钢筋,铺设预应力筋,张拉端锚具埋设,隐蔽工程验收,浇捣混凝土以及混凝土强度达到强度后的张拉,灌浆等一系列的流程操作。
1、钢绞线下料
按细部设计图纸计算下料长度,计算下料长度时应综合考虑构件的孔道长度,锚具厚度,张拉伸长值,构件的弹性压缩值以及张拉时所需的工作長度等,下料长度(L)的公式如下:
L=l+2h+l1+l2
式中:l…孔道曲线长度
h…锚垫板厚度
l1…张拉端千斤顶的工作长度
l2…固定端纲绞线露出锚具的长度,若为两端张拉,则为另一张拉端千斤顶的工作长度。
在平坦干燥的场地上直接用砂轮切割机逐根断料,不得使用气割或电焊切割。同一束孔道内的钢绞线长度基本相同,对不同束、不同长度规格的钢绞线按预应力梁号进行分类编号。
2、固定端P型挤压锚制作
固定端的钢绞线需用专用挤压机制造固定端挤压锚具,严格控制挤压锚具制作质量,挤压时油表压力应在3~60Mpa之间。
3、预应力梁有粘结预应力筋铺放
铺设底板,绑扎骨架钢筋:一般情况下在绑扎完成上下单排主筋和箍筋(开口箍筋)后,就可以穿插进行预应力筋的制作。预应力梁应预留两侧侧模(至少预留一侧模板),在波纹管铺设完毕后再封两侧侧模。
在完成全部钢筋绑扎工作和预应力铺放工程结束后,应进行隐蔽工程的验收,当业主、监理确认合格后方能浇捣砼。
4、浇捣混凝土
浇灌混凝土时应绝对避免振动棒强力撞击波纹管,以防止振动棒将波纹管凿破后漏浆。张拉端、固定端处钢筋较为集中,混凝土浇捣必须注意振捣密实。砼浇捣时,施工人员应严禁踏压或撞碰波纹管,同时应注意端部和钢筋较密处砼的密实性,防止发生空洞现象。
5、预应力筋张拉
在预应力筋张拉前首先应进行设备标定,千斤顶、油泵配套标定采用误差<1%的液压式压力试验机进行标定。预应力筋张拉时,结构的混凝土强度应不小于强度等级的80%。并且张拉前对构件端部预埋件、灌浆孔、混凝土等进行全面检查。
6、锚具保护
有粘结预应力张拉完后,采用手提式切割机或其它机械方式切割多余钢绞线,露出锚具外的钢绞线长度应为20~30mm。用C40 级细石砼封闭锚具夹片与外露钢铰线。
7、孔道压浆
预应力张拉完成后两天内及时进行灌浆,并在灌浆前做好相应的试验工作。 孔道灌浆应采用不低于425号普通硅酸盐水泥配制的水泥浆。所用水泥必须符合国家有关标准规定,不得含有结块物,其中水泥浆水灰比0.4~0.45,水泥浆应保证有足够的流动性。水泥浆流动度宜根据气温条件控制在14~20 秒之间,并应在 40min内流动度无大变化。
4、质量通病及预防处理方法
本工程预应力长索较多,这会造成较大的预应力摩擦损失。而且,因为预应力索很长,在张拉过程当中,预应力筋的伸长受到摩擦阻力的约束,远离张拉端的那一段钢铰线伸长不可能在张拉过程当中迅速完成,需有一定的时间过程来克服摩擦阻力。所以,在预应力张拉施工过程中,张拉的速度不能太快,应该匀速、缓慢地张拉,给钢绞线克服摩擦阻力一定的时间。除此以外,在张拉到控制应力时,还应该持荷一段时间,让钢绞线慢慢地克服摩擦阻力,完成伸长过程。持荷过程结束以后,钢铰线束的应力会有所降低,这时,需要再进行补拉,使应力达到бk持荷的时间,一般应控制在2~5分钟以上。
长孔道的压浆问题,是预应力结构质量控制的关键问题之一。由于预应力孔道内的压浆情况是看不到、摸不着的过程,如果压浆不密实,外表很难看出来,但是对结构的耐久性却影响很大,对于本工程的长预应力孔道压浆,需要仔细地进行水泥浆试配。首先,水泥浆在 1.725L 漏斗中,其稠度应为 14~20 秒;其次,水泥浆的凝固时间应该在 1.5 小时以上。
为了保证长孔道的张拉与压浆质量,要严防在混凝土振捣过程中把波纹管振破,造成孔道漏浆。因此,对于两端张拉的预应力钢绞线,当混凝土浇捣完毕半个小时以后,应该将每束钢铰线轻轻地在管道中进行推拉。如果钢铰线可以顺利地抽动,说明孔道内无漏浆现象;如果无法抽动、或者很难抽动,说明孔道中有漏浆现象发生,应尽快查明漏浆部位,在混凝土没有结硬之前尽快处理。
6、总结
后张法有粘结预应力混凝土施工,提高了构件的刚度,推迟裂缝出现的时间,增加构件的耐久性,可以提高构造本身刚性,减少振动和弹性变形这样做可以明显改善受拉模块的弹性强度,使原本的抗性更强。
参考文献
1、《混凝土结构设计规范》(GB50010——2010)
2、《预应力混凝土用钢绞线》(GB/T5224)
3、《混凝土结构工程施工及验收规范》(GB50204-2002)
作者简介:谭光华1969年10月2日中级工程师