(一)绑扎钢筋绑扎钢筋要在模板提升的同时进行,使水平环向钢筋始终保持在工作平台的底部。如来不及,就与浇砼交叉进行。水平的环向钢筋在垂直钢筋的外侧,所以,绑扎钢筋是在外吊架上进行的,只有双层钢筋或牛腿钢筋,才在内吊架上操作。环向钢筋从工作平台上传到平台下面去时,可一次多穿一些,根据钢筋的粗细把一个班用的数量分2~3次传下去。这样,可以减少操作,加快施工速度。
(A) banding steel banding reinforcement to be carried out at the same time to enhance the template so that the horizontal ring to the bar always maintained at the bottom of the working platform. It was too late, with the concrete pouring cross. The horizontal hoop reinforcement is on the outside of the vertical reinforcement. Therefore, the binding reinforcement is carried out on the outer hanger, and only the double reinforcement or the corbels, only operate on the hanger. When the hoop reinforcement is uploaded from the working platform to below the platform, it can be put on more at a time. According to the thickness of the reinforcing bar, the number of one class can be divided into 2 or 3 times. In this way, you can reduce the operation and speed up the construction.