论文部分内容阅读
文章对即将运营的青藏铁路工程建立了一个以成本-效能评价为总体评价法的国民经济综合后评价体系,其中又以模糊综合评价法对各效能因素进行了模拟评价。
This article establishes a comprehensive post-evaluation system of national economy based on the cost-effectiveness evaluation as the overall evaluation method for the Qinghai-Tibet Railway project to be operated. In the meantime, the fuzzy comprehensive evaluation method is used to evaluate the various efficiency factors.