论文部分内容阅读
针对梅山铁矿采掘失衡和结构参数不尽合理的现状,对增加分段高度和进路间距作了分析,认为两种方法在技术上均可行,经济效益和社会效益显著。
In view of the unbalanced digging imbalance and the structural parameters in Meishan Iron Mine, the paper analyzes the increasing height of section and the distance between the two sections. It is concluded that the two methods are technically feasible and have obvious economic and social benefits.