介绍了废水生化处理装置调试运行状况,主要针对废水处理装置相关设备调试运行、DCS程序控制及SBR池活性污泥培养、驯化过程中产生的相关问题及异常情况做了阐述并进行分析,提出了相应处理措施。
The status of commissioning and operation of wastewater biochemical treatment plant is introduced. The problems related to commissioning and operation of wastewater treatment plant, DCS program control and SBR pond activated sludge cultivation, acclimation and domestication are expounded and analyzed. Corresponding treatment measures.