论文部分内容阅读
以“追求卓越,赶超一流,建设具有河南省特色的现代化肿瘤医院”为战略目标的河南省肿瘤医院,近几年来,围绕“以病人为中心”的服务理念,大胆改革,务实创新,医院基础设施建设呈现出良好的发展势头,先后兴建了8760平方米的新病房楼,并对门诊楼、病房楼等进行了高品位的装修改造,又自筹资金7400万元,购置了美国产瓦里安高能直线加速器、模拟定位机、全自动生化分析仪、微波热疗机以及具有国际领先水平的适形调强照射系统等。经卫生部批准,中南PET中心也将在该院设立,使医院综合实力达到国内先进水平。去年召开的河南省城镇医院基础设施建设暨医院改革现场经验交流会,重点推广了该院的成功经验,受到了业内人士广泛关注和高度评价。
With the goal of “pursuing excellence, catching up with first-rate, building a modern cancer hospital with characteristics of Henan Province”, Henan Cancer Hospital has, in recent years, centered on the “patient-centered” service concept, bold reform, practical innovation, and hospitals. The infrastructure construction has shown a good momentum of development. A total of 8,760 square meters of new ward building have been built successively. High-grade renovations and renovations have been carried out on the outpatient building and ward building, and self-financing fund of 74 million yuan has also been purchased. Ryan high-energy linear accelerators, analog positioning machines, automatic biochemical analyzers, microwave hyperthermia machines, and conformal intensity modulated illumination systems with international advanced level. With the approval of the Ministry of Health, the Central South PET Center will also be set up in this hospital so that the comprehensive strength of the hospital will reach the domestic advanced level. The experience exchange meeting for Henan Province’s urban hospital infrastructure construction and hospital reform held last year focused on promoting the successful experience of the hospital and received extensive attention and high evaluation from the industry.